Mile Gully gushes over new piped-water system

Published: Wednesday | December 4, 2013 Comments 0
Pickersgill
Pickersgill

Orantes Moore, Gleaner Writer

DOZENS OF residents in Mile Gully, St Mary, turned out to watch Robert Pickersgill, minister of water, land, environment and climate change, commission a long-overdue water sup-ply system last week.

The project, which costs more than J$60 million and will benefit hundreds of residents, took 12 years to come to fruition and was initially kick-started by former MP Terrence Gillette.

He told The Gleaner: "This district has everything except piped water. Both JLP and PNP MPs have added to this district. The road we're walking on was made practical by my predecessor Hyacinth Knight, and I started to initiate the piped-water project, but it took a long time in gestation, and today we are proud to see that piped water is in Mile Gully."

His comments were echoed by Pickersgill. "I know this system is long overdue, but as I always say, better late than never.

"The system comprises two independent water systems. The Mile Gully system comprises a pumping station with pump, and five 2,750-gallon plastic tanks for storage. The Warwick Castle system utilises a similar model, with three 2,750-gallon tanks."

rural@gleanerjm.com


Share |

The comments on this page do not necessarily reflect the views of The Gleaner.
The Gleaner reserves the right not to publish comments that may be deemed libelous, derogatory or indecent. Please keep comments short and precise. A maximum of 8 sentences should be the target. Longer responses/comments should be sent to "Letters of the Editor" using the feedback form provided.
blog comments powered by Disqus

Top Jobs

View all Jobs

Videos